| PROJECT INFORMATION |
7.0 Raw Material Consumption
|
| 8.0 Manufacturing Process |
8.1 Please give a brief description of process technology used along with a flow chart (to be enclosed)
|
| Please enclose the Flow Chart (To enclose, please click the "Attachment Button" at the bottom). |
| 8.2 Do you have any foreign technical collaboration ? | Yes No |
| 8.3 If the process technology involves usage of steam, the details of steam generator, i.e., Boiler details and capacity may be furnished. | |
| 9.0 Energy Consumption (Power required for the project) |
| 9.1 Source Energy: | In plant Generation TNEB Supply |
9.2 If energy is generated in plant, fuel used for consumption:
|
| Power Requirements from TNEB ( in KVA ) |
| Temporary (during construction) | |
| Permanent ( production phase) | |
| 9.3 Contracted maximum demand in KVA | |
| 9.3.1 Required power supply line |
|
| 9.3.2 Voltage rating at which HT supply is required: | |
| 9.4 Connected load in kW | |
| 9.4.1 Load Factor | |
Data on Consumer load: (for both new supply and additions to be connected to existing load or if maximum demand exceeds 50 kW)
|
| 9.5 Aggregate installed capacity of the transformers to be installed by the entrepreneur in case of HT/EHT | |
| 9.6 Proposed maximum working hours | |
| 9.7 Expected month of trial production | |
| 9.8 Probable date of requirement of power supply |
| Construction Phase | |
| Commercial Production | |
| 9.9 Details of Plant and Machinery with HP of prime movers (please enclose list) |
| Total HP of Prime movers | |
| 9.10 Chief Electrical Inspectorate (for approval of drawings showing the method of construction and layout of HV/EHV installations) | |
| 9.10.1 Names of contractors (with Licence details) carrying out the installation and the name and the certificate number of supervisor under whose supervision the work will be executed: | |
| 9.10.2 Technical Details of the HV/EHV installation |
| [a] Sub-Station |
|
| [b] Transformer |
|
| [c] Generator (fuel used) | (KVA Voltage Ratio) |
| [d] Switch gear (details of normal and rupturing capacity should be furnished) | |
| [e] Whether parallel operation of generator with TNEB grid proposed. How is excess energy, if any, proposed to be disposed ? | |
| [f] Are all equipment constructed in accordance with the specification and code of practices of the Bureau of Indian Standards ? | Yes No |
[g] Other equipment:
|
9.10.2 Drawing in (in triplicate)
| (i) Site plan showing point of commencement of supply, Location of Sub station, Generator Room, Building Housing other equipments: | To enclose, please click the "Attachment Button" at the bottom |
| (ii) Schematic layout of equipment: | To enclose, please click the "Attachment Button" at the bottom |
| (iii) Physical layout of equipment: | To enclose, please click the "Attachment Button" at the bottom |
| (iv) Plan and elevation of Sub-Station and Generator Room: | To enclose, please click the "Attachment Button" at the bottom |
| (v) Earthing Arrangements: | To enclose, please click the "Attachment Button" at the bottom |
|
Medium Voltage Installations
|
9.10.3 Remittance of fee towards the inspection under Rule 63 of Indian Electricity Rule 1956. (Original Challan to be enclosed and details furnished)
|
9.10.4 Original manufacturer's Test Certificate (for HV Test Results) for EHV/HV equipments and HV cables are to be enclosed. (Original with 2 copies to be sent) | To enclose, please click the "Attachment Button" at the bottom |
Enclosures:
| * Land ownership / Lease deed or allotment letter from SIPCOT etc. | To enclose, please click the "Attachment Button" at the bottom |
| * Copy of NOC / Consent from TNPCB if already obtained | To enclose, please click the "Attachment Button" at the bottom |
| * Authorization from company to signatory to sign HT application etc | To enclose, please click the "Attachment Button" at the bottom |
| * Split up details of connected load | To enclose, please click the "Attachment Button" at the bottom |
|
10.0 Land Allotment (Please fill in this sub part if allotment of land/shed with land required in any industrial park/estate of SIPCOT/TIDCO/ SIDCO) |
| 10.1 Do you propose to locate your project in any SIPCOT/TIDCO/ SIDCO industrial park/estate ? |
Yes No |
| If Yes, Location of Industrial Park/Estate |
|
| 10.2 Extent of land required (in acres) | |
| 10.3 What is the area of land required by your project (Sq.mts / Acres) |
|
| 10.4 If you require ready built shed, then indicate plinth area in Sq. Mts. | |
10.5 Justification for requirement of land (Give breakup of the total area of plot in Sq. Mts)
|
10.6 Details of Demand Draft (for Land allotment)
|
| 11.0 Water Requirement |
11.1 State your water requirement K.L per day
|
| 11.1.1 Year wise demand Ist Year | |
| IInd Year | |
| IIIrd Year | |
11.2 Source of Water
|
| 11.3 Source of supply acceptable from |
|
| 11.3.1 Point of Tapping | |
| 11.3.2 Distance from source of water to point of delivery and lift of water required | |
| 11.4 Average daily requirement of water for: (in K. Liters) |
|
| 11.5 Quality standard of water required for |
|
| 12.0 Locating in Private Land |
| 12.1 If private land is identified outside industrial park, then enclose sketch of identified land Specifying its location | To enclose, please click the "Attachment Button" at the bottom |
| Name of the Panchayat or Village, S.No of the land and name of the village may be given | |
| Is the land situated within any municipality or Municipal Corporation/Cantonment Jurisdiction ? |
Yes No |
| If Yes, Name of the Municipality / Municipal Corporation / Cantonment | |
Whether the land is located near the following:
|
| If Yes, then indicate the distance in Kilometers | |
| 12.2 Please enclose a topographical plan showing the following details |
| - Clear demarcation of nearest water source and agricultural lands | To enclose, please click the "Attachment Button" at the bottom |
| - Residential areas and villages nearby | To enclose, please click the "Attachment Button" at the bottom |
| - Name of the abutting road and its status (Public/Private) | To enclose, please click the "Attachment Button" at the bottom |
| 12.3 Area proposed to be developed now in first phase (within first 3 years, in acres): | |
| Area proposed to be developed in second phase | |
| 12.4 Do you need Government assistance in acquiring land ? | Yes No |
| Land use reclassification |
| 12.5.1 Name of the Local Planning Area: | |
| 12.5.2 Approach Road (width/WBM or BT or earthern/ Maintaining Authority: | |
| 12.5.3 Extend of land Sl.No. (in acres) | |
12.5.4
(a) Master Plan
| (i) Present Stage | |
| (ii) Proposed land use as per Master Plan | |
| (iii) Present usage of land | |
| (iv) Land use variation requested for | |
(b) DDP/TP Scheme
| (i) Name of the Scheme | |
| (ii) Stage of the Scheme | |
| (iii) Proposed land use as per scheme | |
| (iv) Variation to type of land use requested | |
|
| 12.5.5 (i) Whether site lies in Heritage town | Yes No |
| (ii) If yes, distance between the site and heritage site: | |
| 12.5.6 (i) Whether site lies in Archeologically important area?: | Yes No |
| (ii) If yes, distance between the site and Archaeology declared area in Kms.: | |
| 12.5.7 (i) Whether site lies in CRZ | Yes No |
| (ii) If Yes, where it lies |
CRZ1 CRZ2 CRZ3 |
| 12.5.8 Surrounding land/building use: | |
| 12.5.9 Whether Burial ground / Burring ground lines within 90 metre: | Yes No |
| 12.5.10 Whether site lies in catchment: | Yes No |
| 12.5.11 Impact on infrastructure due to proposed land use variation: |
| (i) Transport | |
| (ii) Drinking water | |
| (iii) Drainage | |
| (iv) Electricity | |
| (v) Public Open Space | |
|
| 12.5.12 Authenticated Topo sketch within 500 meter radius: | To enclose, please click the "Attachment Button" at the bottom |
| 12.5.13 Authenticated Extract of Master plan/ DD Plan: | To enclose, please click the "Attachment Button" at the bottom |
| 12.5.14 Authenticated site plan with measurements: | To enclose, please click the "Attachment Button" at the bottom |
| 12.5.15 FMB Sketch: | To enclose, please click the "Attachment Button" at the bottom |
| 12.5.16 Copy of Chitta, Patta, document copies: | To enclose, please click the "Attachment Button" at the bottom |
| 12.5.17 Objections and Suggestions: | |
| 12.5.18 Court action if any: | To enclose, please click the "Attachment Button" at the bottom |
| 12.5.19 Details about publication: | |
| 12.5.20 Local body resolution | To enclose, please click the "Attachment Button" at the bottom |
| Attachment: | Click here to attach |